We Deliver The Highest Quality Of Standards Since 1991.

Bitumen Rail Terminal Design &Build Project

Location: Haldimand County, Ontario

Project Value: $8 Million

Our company recently completed a significant infrastructure project in Haldimand County, Ontario – the design and construction of a state-of-the-art Bitumen Rail Terminal. This $8 million project showcased our expertise in rail infrastructure development, civil engineering, and comprehensive project management. From conception to completion, our team demonstrated the ability to handle complex, multi-faceted projects while maintaining the highest standards of quality and safety.

Key Project Components

The scope of this project was extensive, encompassing all aspects of terminal construction:

Full-Service Design and Execution

Our team designed and self-performed all grading and civil works, as well as track construction.

Strategic Rail Components:

Strategic Rail Components

Extensive Groundwork Preparation

Environmental Considerations

Project Highlights

Our forward-thinking approach to this project is exemplified by our extensive groundwork
preparation. Beyond meeting the immediate needs of the terminal, we planned for future
expansion. This proactive planning ensures that the terminal can grow seamlessly to meet
increasing demand without the need for disruptive construction in the future

Accessibility and durability were key considerations in our design. The Asphalt Grade Crossing with Rubber Rail Seal provides a smooth transition for vehicles crossing the tracks while also reducing noise and vibration, minimizing the terminal’s impact on the surrounding area. The Timber Grade Crossings offer versatile access points throughout the facility

Environmental considerations were integral to our design and construction process. The
installation of CSP culverts ensures proper drainage throughout the site, protecting the integrity of the rail infrastructure and helping to control erosion and manage water flow, thus minimizing the terminal’s environmental footprint.

Ongoing Commitment

Our commitment to this project extends well beyond the construction phase:

This ongoing involvement ensures compliance with all relevant safety and operational standards, and allows us to provide continuous support, maximizing the terminal’s operational
efficiency and lifespan.

Conclusion

This Bitumen Rail Terminal project stands as a testament to our company’s capabilities in delivering complex rail infrastructure solutions. It demonstrates our ability to combine technical expertise with innovative design, always with an eye toward future needs and environmental responsibility. From the initial design phases through to ongoing maintenance, this project underscores our commitment to long-term client satisfaction and our position as a leader in the rail infrastructure industry

Related past work

Malton Go Station & Track Upgrades, Metrolinx, Toronto, Ontario $20MM Project.

VIP Rail – Yard Expansion, Phases 1 & 2 - Sarnia, Ontario $4mil Project